Free for everyone: Browse the Data Center Event Directory →

conference

Advancing Data Center Electrical Innovation 2026

August 17-19, 2026 (1 workshop day + 2 conference days)
The Highland Dallas, Curio Collection by Hilton, 5300 E Mockingbird Ln · Dallas, TX
Organized by Advancing Construction
Visit WebsiteVerified 7/22/2026

About this event

Peer-driven forum for 100+ electrical engineering leaders addressing surging power demands as AI and HPC push critical loads toward 1.5-2 GW per site. Focus on validating load assumptions, resilient distribution planning, equipment lead times, and aligning electrical design with delivery schedules.

Session topics & tracks

Load validation; resilient electrical distribution; equipment lead times; design-to-delivery alignment; substation/switchgear strategy; medium-voltage DC power.

Speakers

Guy Marom (VP Data Center Systems, MARA); Oscar Gross (VP Mission Critical Solutions, Tetra Tech); Rajesh Gopinath (DC Systems Power Engineer, Oracle).

Sponsors & partners

Key partners: 3M, SEL, EAE, Enduro Composites, Nomad Futurist.

Who should attend

Electrical engineers at hyperscalers, colocators, developers, engineering firms, MEP contractors.