Free for everyone: Browse the Data Center Event Directory →

Crusoe Energy

Developer
7
Total Signals
3
States Active
2
Markets

Construction Stages

4
Operational
1
Pre-Permit
2
Unknown Stage

Signal Types

Air Permit5
Market Report2

Active States

Active Markets

JacksonJackson County

Partner Network

Team Intelligence

DCWeeklyIntel tracks 13 data center professionals at Crusoe Energy.

Project Leadership
3
Construction Management
2
Engineering & Design
5
Business Development
1
Other
2
Other13

13 team members linked to active projects

See the full team with titles, LinkedIn profiles, and project links.

Unlock with Premium →

Recent Signals

Unknown

OperationalAir Permit
Walden Area, CO, CO

Crusoe Energy operates the Surprise S9 Facility in Jackson County, Colorado, classified under computer processing and data preparation services. The rural Colorado location combined with Crusoe Energy's business model suggests this is likely a cryptocurrency mining facility rather than a traditional data center. While specific scale indicators aren't available, the facility is currently operational rather than in planning stages. This represents a completed project already in operation rather than an early development opportunity.

Apr 9, 2026

Unknown

OperationalAir Permit
Walden 8.8 Mi. N Of, CO, CO

Crusoe Energy operates a data processing facility at the Oxbow Pad location in Jackson County, Colorado, situated in a rural area north of Walden. The facility aligns with Crusoe's business model of utilizing stranded natural gas for cryptocurrency mining operations. While specific capacity metrics aren't available, the site appears to be either operational or in advanced development stages based on its current registration status. This represents one of Crusoe's distributed computing installations that convert otherwise wasted natural gas into computational power.

Apr 9, 2026

Unknown

OperationalAir Permit
Walden 8.8 Mi. N Of, CO, CO

Crusoe Energy has an facility registration for a site called Oxbow Pad located 8.8 miles north of Walden in Jackson County, Colorado. The facility is classified under SIC code 7374 (computer processing and data preparation services), which strongly suggests data center operations. The remote rural location and 'pad' designation could indicate a specialized data center facility, possibly related to cryptocurrency mining or edge computing given Crusoe's business model. This EPA registration represents an operational facility rather than a construction permit, suggesting the project may already be built and operational or nearing completion.

Mar 31, 2026

Unknown

Pre-PermitAir Permit
Walden Area, CO, CO

Crusoe Energy has registered a facility called 'Veneta Pad' in Jackson County, Colorado with EPA under SIC code 7374 (data processing services). The company is known for cryptocurrency mining operations that often utilize data center infrastructure. The facility registration in a rural Colorado location suggests potential data center development, though specific scale indicators are not provided in this permit record. This EPA registration is typically an early-stage requirement that occurs well before construction activities begin.

Mar 29, 2026

Unknown

OperationalAir Permit
Walden 8.8 Mi. N Of, CO, CO

Crusoe Energy has an facility registration for a site called Oxbow Pad located 8.8 miles north of Walden in Jackson County, Colorado. The facility is classified under SIC code 7374 (computer processing and data preparation services), which strongly suggests data center operations. The remote rural location and 'pad' designation could indicate a specialized data center facility, possibly related to cryptocurrency mining or edge computing given Crusoe's business model. This EPA registration represents an operational facility rather than a construction permit, suggesting the project may already be built and operational or nearing completion.

Mar 29, 2026

Unknown

Unknown StageMarket Report
Nevada

Crusoe Energy and Redwood Materials are expanding their AI data center deployment in Nevada, marking a significant infrastructure investment in the state's growing computational hub. This partnership combines Crusoe's energy-efficient data center expertise with Redwood Materials' operational capabilities to scale AI infrastructure in the region. The expansion reflects accelerating demand for AI compute capacity and demonstrates Nevada's strategic importance as a data center destination, particularly for companies seeking power-efficient solutions and sustainable operations.

Mar 28, 2026

Unknown

Unknown StageMarket Report
Texas

Crusoe Energy is deploying modular data centers at Energy Vault's technology center in Snyder, Texas, marking a direct partnership between a hyperscale AI infrastructure operator and an energy storage technology provider to co-locate compute with thermal energy systems. The deployment leverages Energy Vault's existing facility infrastructure and thermal capabilities, though specific MW capacity and contract value have not been disclosed publicly. This signals a shift toward integrated energy-compute architectures where AI workload operators are actively seeking partnerships with non-traditional data center providers to secure dedicated, thermally-optimized infrastructure outside conventional colocation markets. The pairing is notable because it represents Crusoe's expansion beyond its core oil-and-gas flare mitigation use case into broader AI compute deployment, and Energy Vault's pivot from pure energy storage toward becoming an infrastructure host. For equipment vendors and BD teams, this demonstrates demand for purpose-built modular solutions that can integrate with alternative energy systems, and validates the addressable market for companies positioning thermal-efficiency as a competitive differentiator in AI infrastructure.

Mar 22, 2026

Track Crusoe Energy activity weekly

Subscribe for curated intelligence on Crusoe Energy and other data center companies. Project updates, GC awards, and permits — delivered every Monday.

View Pricing